Drill holes are points and paths through rock. A mineral resource estimate is a later attempt to describe the amount, grade and shape of mineralized rock between and around those observations. It requires a geological model, dependable assays, density information, a reasonable level of continuity and assumptions about possible extraction. The estimate is not gold stored in a vault. It can change as new holes are drilled or the assumptions change. A reserve is a separate, more advanced step that considers whether part of the resource can be mined economically under a defined plan.

Canadian public reporting uses definitions from the Canadian Institute of Mining, Metallurgy and Petroleum, known as CIM, through National Instrument 43-101. These terms have specific meanings. A company can report exciting exploration results long before it has enough information for a resource. It can report a resource without having a reserve. It can also find gold that never becomes a mine. The path from one stage to the next involves uncertainty, technical work, costs and decisions beyond geology.
How a resource estimate begins
Geologists build a three-dimensional model of the rock units and mineralized zones. They use drill collars, hole surveys, core logs, assays and sometimes surface work. They decide which samples belong to the same geological domain, how to handle very high grades and how far information can reasonably be projected away from a hole. A block model divides the volume into small cells and estimates grade within them using the available samples. The model is a reasoned estimate, not a direct measurement of each block.
Density is needed to turn volume into tonnes. Assay quality, sample recovery, spacing between holes and the geological interpretation affect confidence. A resource also needs reasonable prospects for eventual economic extraction under stated assumptions. A cut-off grade is one way to decide which parts of the model are included for a particular mining scenario. Changing the cut-off can change the reported tonnes and average grade. Always read the cut-off, metal prices, recovery and mining assumptions beside a resource headline.
Inferred, indicated and measured
An inferred mineral resource has the lowest geological confidence of the three resource categories. Its quantity and grade are estimated from limited evidence, so more work is needed before detailed economic conclusions are drawn from it. Indicated has enough confidence to support more advanced mine planning, while measured has the highest confidence in the local geological and grade estimates. These are confidence categories, not quality labels for the gold itself. A measured tonne is not automatically profitable.
Drilling more holes can move some material into a higher-confidence category if the results support continuity. It can also shrink, shift or remove part of an earlier interpretation. A company may publish a larger total resource while the average grade falls, or report fewer tonnes after using a higher cut-off. Compare the categories separately rather than adding every ounce into one unqualified total. Check the effective date and whether the new estimate replaces an older one.
What a reserve adds
A mineral reserve is the economically mineable part of a measured or indicated resource after modifying factors have been applied. These factors include mining method, dilution, recovery, processing, costs, markets, legal matters, environmental work, infrastructure and social considerations. Canadian definitions call for at least a pre-feasibility study to convert resources into reserves. An inferred resource cannot be converted directly into a reserve. A reserve still depends on assumptions and is not a promise that every planned tonne will be mined exactly as estimated.
Mine planning can add waste rock or lower-grade material to what is extracted, a process called dilution. Some resource rock may be left behind because it is unsafe or uneconomic to recover. Processing will not necessarily recover all the gold contained in mined rock. These differences explain why “contained ounces” in a resource or reserve are not the same as ounces expected for sale. A release that treats contained metal as future production skips several steps.
Study stages and changing numbers
Early economic studies use broad assumptions to test possible development paths. A pre-feasibility study adds enough work to compare realistic mine designs and support reserve conversion where the standards are met. A feasibility study takes the design, costs and risks further. The exact scope is project-specific. Each study may change the mining method, processing plan, capital cost, schedule and gold-price assumption. A technically attractive resource can be difficult to finance or operate at a particular place and time.
Metallurgy is central. The grade in the rock says how much gold is present; test work asks how much can be recovered with a proposed process. Hardness, grain size, sulphide content and other minerals can affect grinding and recovery. One small laboratory test may not represent all zones of a deposit. Teams may test different ore types and composites as the project matures. A headline grade is therefore only one part of the possible revenue side of a mine plan.
Ground, water and communities
A possible mine needs access, power, water, waste-rock and tailings plans, a workforce and a way to move material. Its environmental review and approvals may be extensive. Indigenous rights and relationships with affected communities are part of the setting, not an afterthought. A resource estimate says something about mineralized rock under defined assumptions; it does not grant permission to build. The next useful news may be a baseline study, an agreement, a permit decision or a revised plan rather than another assay.
Historic mines and nearby roads can help a project, but they do not eliminate site-specific studies. An old shaft might have incomplete records or different safety conditions. A power line on a map may lack capacity or a workable connection. A road may need upgrades. Responsible reading keeps those practical questions separate from the geological excitement of a discovery. Mine development is a sequence of decisions, each requiring its own evidence.
Compare resource headlines carefully
Record tonnes, grade, contained ounces, category, cut-off grade and effective date. Note whether the estimate is open-pit, underground or a combination, and whether it uses a constrained pit shell or another shape. Check how much of the total is inferred. Compare the current figures with the prior report using the same categories and assumptions if possible. A change may reflect new drilling, a new price, a revised model or a different cut-off. The headline alone rarely tells you which.
Read the qualified person’s technical report for methods, sensitivity and risks. Canadian public companies file project disclosure under NI 43-101, and the CIM definitions set the meanings of resource, reserve and study terms. The CIM estimation guidance adds detail on confidence and conversion. Our drill-results chapter covers the earlier evidence that feeds a model. This page helps put a resource news release in its proper stage, without treating an estimate as a finished mine.